at a glance
01
A high-availability facility built for continuity.
02
Engineered for disaster-recovery resilience.
03
Infrastructure-first, from an infrastructure-first firm.
what d360 delivered — interior
- Secure equipment halls
- Controlled operations areas
what d360 delivered — infrastructure
- High-availability data centre
- Disaster-recovery design
- Redundant power & cooling
- Structured cabling backbone
the challenge
An investment group required a high-availability facility engineered for disaster recovery — continuity of critical systems was the entire brief.
the solution
D360 drew on its data-centre heritage to build a resilient, redundant facility designed around uptime and recovery from the ground up.
the outcome
A continuity-grade facility, delivered by a partner whose roots are in enterprise infrastructure.

